County Road Administration Board
  • Home
  • Administration
    • About CRAB
    • Accountability
      • Laws and Rules
    • Standards of Good Practice
    • Compliance
    • Reports
      • Annual Report
      • CFGS Report
      • MMS Report
  • Funding
    • Grant Programs
    • Motor Vehicle Fuel Tax
    • Property Tax
  • Engineering
    • Administration
      • Professional Development
      • Organizational
      • Personnel
    • Compliance
      • Training and Guidance
      • Policies
      • Technical
    • Operations
      • Construction
      • Preservation
      • Maintenance
  • Technology
    • Design Systems
    • Mobility Software
    • Training
      • Design Systems Training
      • Mobility Training
    • CRAB FTP Site
  • Counties
    • County Profiles (MRSC)
    • County Contacts
    • County Data Tables
    • County Job Links
  • Library
  • Contact
Search CRAB Web

Project Links

  • Grant Program Projects
  • Active Projects
  • RAP Current Project Funding
  • Project Lapsing Status
  • Completed 2000 - 2009
  • Completed Pre - 2000
  • Featured Projects
  • RATA Fund Expenditures

Related Links

  • Grant Programs
  • Construction
  • Preservation

Related Links

  • Grants Home
  • Projects
  • RAP Forms
  • RAP FAQ's
  • RAP Regions
  • Due Dates Calendar

 

 

Access Washington

 

Featured Project


GRAYS HARBOR COUNTY - SOUTH BANK ROAD

Project Summary
Project Images

Project Number: 1499-02
From Milepost: 11.2 To Milepost:11.9
RATA/CAPP funds: $ 985,500
Design Software: Eagle Point
Completed: 2007

South Bank Road is a major collector route that connects Oakville with Elma in east Grays Harbor County. It serves as an alternate route between these communities and is used as a detour when SR 12 is blocked by serious accidents or land-slides. It is classified a T-3 freight and Goods Road and is the primary access to 5,000-acres of farm land and 50,000-acres of timberland.

The project replaced three substandard 25 mph curves with one 50 mph curve eliminating the need for 4 warning signs. This involved excavating approximately 26,000 cubic yards of gravel material and using it for structural fill and gravel base. The new roadway section has a 24-foot travelled way and two 5-foot shoulders for a total paved width of 34-feet.

A 2350-foot radius horizontal curve was used to keep the affected wetland area under 0.5-acre to expedite the permitting process. A 20-foot wide low profile arch was used to replace two 3-foot diameter culverts that were fish passage barriers.

Click on project thumbnails to display larger images.

road project image road project image




CRAB point of contact for both RAP and CAPP programs is Randy Hart P.E., Grant Programs Manager, 360.753.5989


© Copyright 2009 County Road Administration Board - HomeSearchPrivacyAboutContactFeedback